About: Ram Jhula Suspension Bridge (1985-1986) May 27, 2011 • Tusharr • Tehri Garhwal, Uttarakhand • Tags: Rishikesh Sivananda Jhula i.e., Ram Jhula construction period was between 27th March 1985 – 5th April 1986. Like this:Like Loading... Related Posts: How I reach Rishikesh from Badrinath by Jeep How to reach Piran Kaliyar Sharif from Rishikesh? Auto Fare from Tapovan, Rishikesh to Haridwar Railway Station? Popular Posts: Buddhist Quotes from Dhammapada Slender-billed Gull Braj ke Dohe at Sewa Kunj May 27, 2011 • Tusharr • Tehri Garhwal, Uttarakhand • Tags: Rishikesh