About: Ram Jhula Suspension Bridge (1985-1986)

About: Ram Jhula Suspension Bridge (1985-1986)

Sivananda Jhula i.e., Ram Jhula construction period was between 27th March 1985 – 5th April 1986.

Leave a Comment

sixteen + = 21