About: Ram Jhula Suspension Bridge May 27, 2011 • Tushar • Tehri Garhwal, Uttarakhand • Tags: Rishikesh Sivananda Jhula i.e., Ram Jhula’s construction period was between 27th March 1985 – 5th April 1986. Related Posts: Distance from Kund to Tourist Places Rishikesh to Devprayag – Distance and Driving Directions Dwi Pada Sirsasana – Yoga Pose Wall Art May 27, 2011 • Tushar • Tehri Garhwal, Uttarakhand • Tags: Rishikesh