About: Ram Jhula Suspension Bridge May 27, 2011 • Tushar • Tehri Garhwal, Uttarakhand • Tags: Rishikesh Sivananda Jhula i.e., Ram Jhula‘s construction period was between 27th March 1985 – 5th April 1986. Related Posts: Clean Ganga, Clean Himalaya Initiative Ganpati Painting on The Wall Neer Waterfall – Summary for The Tourists May 27, 2011 • Tushar • Tehri Garhwal, Uttarakhand • Tags: Rishikesh